Delays Expected on 14th St NW and I-395 Bridge as Friday Commute Begins

Morning Commute Overview
Washington D.C. commuters can expect a clear but chilly drive this Friday, February 13, 2026. While weather conditions are sunny with temperatures rising into the high 30s, several major infrastructure projects and emergency repairs are impacting traffic flow across the District and the surrounding beltway. Travelers should account for significant detours in Northwest D.C. and ongoing bridge work on the I-395 corridor.
Major Road Closures and Traffic Advisories
- 14th Street NW: Northbound lanes remain closed between L Street and Thomas Circle. DC Water has been conducting emergency stabilization work on an abandoned 100-year-old sewer tunnel that was found at risk of collapsing earlier this week. Motorists are being diverted to 13th Street or 15th Street. Southbound lanes currently remain open, but heavy congestion is expected during peak hours.
- I-395 HOV Bridge: The rehabilitation project on the I-395 HOV bridge continues this week with concrete deck replacement. Commuters should expect narrowed lanes and potential short-term closures in both northbound and southbound directions.
- I-295 Construction: Paving operations and bridge improvements are active on I-295 in Ward 8, specifically between I-695 and the Maryland line. Expect intermittent lane closures and construction vehicles moving through the area.
- Dalecarlia Parkway NW: Weekday lane closures are in effect for utility work. Drivers should expect delays when traveling between Western Avenue and Massachusetts Avenue.
Public Transportation and Rail Updates
The Washington Metropolitan Area Transit Authority (WMATA) is reporting mostly on-time service for the Metrorail, though station improvements are affecting access at specific locations. Metrobus riders should be prepared for detours on routes serving the 14th Street corridor due to the aforementioned roadway repairs.
- Navy Yard-Ballpark Station: The Half Street entrance remains closed for a major escalator replacement project. All passengers must use the New Jersey Avenue entrance. This closure is expected to last through March 2026.
- Crystal City Station: Preparations are underway for the construction of a second entrance. While the station is open today, commuters should be aware that weekend closures affecting the Blue and Yellow lines are scheduled throughout the month.
- MARC Train: Regular Friday service is in effect today. However, the Maryland Transit Administration has announced a special 'R' schedule for the upcoming Presidents Day holiday on Monday, February 16.
Commuter Safety Tips
With temperatures dropping well below freezing overnight, residents are advised to watch for lingering ice patches on shaded secondary roads and bridges. Additionally, the Georgetown DMV Service Center remains closed until further notice due to a major water main break; residents needing services are encouraged to use online portals or the mobile app to avoid unnecessary travel to the area.